1. Enter the equipment count
Use the number of similar machines expected to contribute to the same production task.
2. Enter rated hourly capacity
Use the manufacturer, test, or planning capacity in a consistent unit per hour for one machine.
3. Set the shift length
Enter the scheduled operating hours available in the shift.
4. Apply utilization and efficiency
Utilization represents the share of shift time the equipment is active; efficiency adjusts active-time production below rated output.
5. Enter required shift output
Use the schedule quantity to see whether effective capacity provides a margin or shortfall.
6. Review effective capacity
Compare hourly and shift capacity with the planned requirement before using the result in a schedule.