1. Enter availability
Use the percentage of planned production time during which the CNC machine was actually running.
2. Enter performance
Use actual running speed as a percentage of the ideal or standard production speed for the modeled work.
3. Enter quality
Use good parts as a percentage of total parts produced during the same period.
4. Read the OEE result
The calculator multiplies the three percentage factors after converting them to decimals.
5. Inspect the components
Use the individual factors to identify whether time loss, speed loss, or quality loss is the largest constraint.