1. Enter average daily input
Use the typical tons of organic feedstock received on an operating day.
2. Set bulk volume per ton
Enter the loose cubic yards occupied by one ton under the way the material is actually stored. Use measured container or pile data when available.
3. Choose storage duration
Enter the number of days material is expected to remain in the storage area before processing or shipment.
4. Add a contingency margin
Use the percentage field to provide room for uneven deliveries, delayed processing, or other normal variation.
5. Review required volume
The result shows total cubic yards after contingency, plus the base storage volume and average daily bulk volume.