1. Count usable doors
Enter the number of dock doors expected to be actively available to the cross-dock flow.
2. Set handling rate
Enter average shipments processed per active door-hour under the operating method being evaluated.
3. Enter the operating window
Use the number of hours represented by the capacity estimate.
4. Apply availability
Reduce theoretical capacity for planned or typical loss of usable operating time.
5. Compare capacity with demand
Use the estimated shipment capacity as a screening figure before checking peak arrival and staging constraints.