1. Enter the active transfer rate
Use the average Mbps observed or expected while the transfer process is running.
2. Define the daily transfer window
Enter the number of hours per day during which the workload could transfer data.
3. Set the period length
Choose how many days the estimate should cover.
4. Adjust the duty cycle
Use 100% for continuous transfer throughout the window, or a lower value when the workload is active only part of that time.
5. Read total and daily volume
The result shows total decimal gigabytes, with terabytes and average daily usage in the breakdown.