1. Enter rated capacity
Use the bucket, bowl, or body volume for the equipment configuration being evaluated.
2. Set the fill factor
Enter the average fraction of rated volume carried each cycle. A value below 100% represents partial filling; values above 100% should only be used when justified.
3. Enter cycles per hour
Use a realistic complete-cycle rate that includes loading, travel or swing, dumping, and return time.
4. Apply operating efficiency
Reduce theoretical output for normal nonproductive time within the work hour.
5. Set daily hours and review
Translate the effective hourly capacity into an estimated daily quantity for planning.