1. Enter excavation length
Use the horizontal length of the excavation footprint in feet.
2. Enter excavation width
Use the average or designed width represented by the quantity.
3. Enter average depth
Use a representative vertical depth; split the area into sections if depth varies substantially.
4. Enter swell allowance
Use the expected percentage increase from bank volume to loose excavated volume.
5. Review volumes
The main result shows bank cubic yards; the breakdown also shows loose cubic yards and the added swell volume.