1. Enter total fence length
Use the linear footage of the fence included in the budget.
2. Enter the material rate
Use a current per-foot material figure for the fence type and quality you are considering.
3. Enter the labor rate
Use a contractor quote or internal labor allowance per linear foot.
4. Add gate cost
Enter the combined cost of gates and gate-specific hardware if it is not already included in the lineal rates.
5. Add fixed costs
Include removal, permits, delivery, mobilization, or similar lump-sum items.
6. Set contingency
Reserve a percentage for uncertain quantities or unforeseen conditions.
7. Review the total
Use the category breakdown to identify which assumptions have the largest effect on the project budget.