1. Enter recoverable supply
Use the greywater volume that could reach the reuse system over the selected period.
2. Enter eligible demand
Include only end uses permitted and connected to receive treated greywater.
3. Set system availability
Account for planned or expected downtime with a percentage between 0 and 100.
4. Keep the period aligned
Supply and demand should both be monthly, annual, or another matching period.
5. Review savings and coverage
Use the remaining demand to estimate how much conventional supply is still needed.