1. Enter machine throughput
Use the expected material delivery rate in pounds per hour for the equipment and material combination.
2. Enter installed material rate
Use pounds of insulation required per square foot for the selected thickness or density.
3. Set operating hours
Enter the hours the machine can reasonably be available during a workday.
4. Set utilization
Use a percentage below 100% when loading, moves, adjustments, or stoppages reduce active output.
5. Enter target daily area
Add the square footage you want the equipment fleet to support each day.
6. Review capacity
The main result is area per operating hour; supporting results show daily capacity and an approximate unit count.