1. Enter the payload load
Use the electrical draw expected during the representative science or encounter mode.
2. Add bus and thermal loads
Include avionics, communications support, heaters, and other concurrent loads in the two supporting fields.
3. Set design margin
Use the margin policy appropriate to the project phase.
4. Describe the no-generation interval
Enter the duration the battery must support the design load and the effective delivery efficiency.
5. Review design load and energy
Compare the required watts with generation capability and the watt-hours with usable battery capacity.