1. Enter available maintenance time. Use the minutes genuinely available for the work during the planning window.
2. Enter required tasks. Enter the number of maintenance tasks that must be completed in that same window.
3. Review takt time. The main result shows the maximum average minutes available per required task.
4. Compare with actual cycle time. If observed cycle time is consistently above takt time, the workload may require more capacity, a longer window, or a different work plan.