1. Choose comparable measurements
Use the same assay, units, normalization, and sample basis at both time points.
2. Enter the initial value
The starting quantity must be positive because logarithmic doubling calculations cannot use zero.
3. Enter the later value
Use a larger final value when estimating positive doubling time.
4. Enter the observation interval
Provide elapsed time in hours.
5. Treat the result as a model summary
Use the estimate only if exponential increase is a meaningful approximation for the process you are studying.