1. Enter concrete volume
Use the concrete volume for the structural scope whose reinforcing steel you are estimating.
2. Enter a rebar rate
Use a project-specific pounds-per-cubic-yard factor from preliminary design information, historical data, or a quantity study.
3. Set an allowance
Add a percentage for laps, cutting, fabrication, and other overage not already included in the base rate.
4. Confirm pounds per ton
Use 2,000 lb for a US short ton or change the field if your procurement convention differs.
5. Review base and gross weight
The calculator shows the factor-based base weight separately from the allowance and final order estimate.