1. Enter an approved cycle load
Use a load per cycle that is already within the equipment manufacturer’s allowable capacity for the actual setup.
2. Estimate cycles per hour
Enter the realistic number of complete load-move-return cycles expected in one productive hour.
3. Apply operational utilization
Reduce theoretical throughput for loading, unloading, positioning, waiting, and other normal interruptions.
4. Review effective throughput
Use the adjusted hourly output for material-flow and schedule planning.
5. Keep safety limits separate
Never increase the cycle load to compensate for low utilization; verify equipment limits independently.