1. Enter available time
Use the total minutes genuinely available to perform the required changeovers during the planning window.
2. Enter required changeovers
Use the number of tool changes the production plan requires in that same window.
3. Add actual cycle time
Enter your current average changeover time to compare actual performance with the required pace.
4. Review the gap
A positive cycle-to-takt gap means the current average takes longer than the available pace per changeover.