1. Enter planned time
Use the production time that was scheduled for the batch equipment.
2. Enter actual run time
Exclude downtime that stopped productive operation.
3. Describe batch pace
Enter the ideal batch cycle time and the number of batches actually produced.
4. Enter quality totals
Provide total output and the portion accepted as good output.
5. Compare the three factors
Review availability, performance, and quality before interpreting the combined OEE.