1. Measure the floor
Enter the bathroom floor area that will receive tile.
2. Measure tiled walls
Enter the wall area to be tiled, including shower or tub surround surfaces in scope.
3. Measure backer coverage
Enter the area where cement board or another backer product will be installed.
4. Add waste
Choose one waste allowance for the planning scenario.
5. Convert to packages
Use the adjusted areas to calculate boxes, sheets, or boards based on product coverage.