1. Enter usable storage
Use the stored energy available before applying the operating reserve.
2. Enter the operating rate
Use the expected constant consumption or withdrawal rate in the matching unit per hour.
3. Set a reserve
Hold back a percentage for safety, process stability, or minimum inventory.
4. Check remaining energy
Enter an elapsed operating time to see the estimated quantity still available.
5. Review duration
Use the hours and days as a planning estimate and account separately for losses or variable demand.