1. Enter annual useful output
Use the annual energy the system must deliver at the selected output boundary.
2. Set operating hours
Enter the realistic number of hours the equipment can operate each year.
3. Estimate load factor
Use the average share of rated capacity expected during operating hours.
4. Enter conversion efficiency
Use useful output divided by input energy on a consistent basis.
5. Add a design margin
Include an allowance for uncertainty, growth, degradation, or operating reserve.
6. Review rated capacity
Use the result for preliminary screening, then validate it against peak loads and vendor data.