1. Define the cost scope
Enter the database costs you want included for one consistent period.
2. Measure workload volume
Enter the number of workload units delivered during that same period.
3. Choose a reporting block
Set a convenient normalization size, such as 1,000 or 1,000,000 units.
4. Check the unit cost
Use the main result to compare normalized database economics across periods or systems.
5. Keep definitions consistent
For trend analysis, use the same workload definition and cost scope each time.