Which utilization metric should I use?
Use a metric tied to the resource you are evaluating, such as compute, memory, IOPS, or throughput. Calculate each important dimension separately rather than mixing units.
What if utilization exceeds 100%?
That can indicate bursting, overcommit, throttled demand, or mismatched measurement definitions. Verify the source metrics before using the result for a capacity decision.
Is average utilization enough for sizing?
Usually not by itself. Averages can hide spikes, so capacity planning often benefits from peak or high-percentile metrics plus latency and saturation indicators.
What target utilization should I choose?
Use a target that reflects the workload’s variability, scaling behavior, failover requirements, and performance objectives. The calculator does not prescribe a universal target.
Can low utilization still be justified?
Yes. Spare capacity may be intentional for failover, burst traffic, maintenance, or strict latency goals. Cost efficiency should be balanced against reliability requirements.