1. Enter route distance
Use the actual planned route or lane distance.
2. Set average movement speed
Use an operating average rather than vehicle top speed.
3. Add pre-cooling or cold handling
Include product conditioning, logger setup, staged loading, or other planned pre-departure cold-chain time.
4. Add dwell and transfers
Enter planned stationary time during cross-dock, hub, inspection, or transfer activity.
5. Review elapsed duration
The main result is total time in days, with travel and process components shown separately.