1. Enter the installation area
Use the measured square footage of flooring to be installed.
2. Set productivity
Enter how many square feet one worker can install in one labor hour under expected conditions.
3. Add preparation labor
Enter person-hours for staging, layout, minor preparation, transitions, and cleanup that are not captured by the production rate.
4. Enter crew size
Use the number of workers expected to share the job.
5. Review labor and schedule
Total person-hours support labor estimating; crew duration shows the approximate clock time under the even-work-sharing assumption.