1. Define the exposed cost base
Enter the annual operating or project cost amount that could be affected by heat-related transition pressures.
2. Set the cost increase
Enter the percentage increase you want to test for the scenario.
3. Estimate mitigation
Provide the percentage of gross transition exposure expected to be avoided through adaptation or other measures.
4. Review residual exposure
The main result shows the incremental annual cost remaining after mitigation.
5. Stress-test the assumptions
Raise or lower the cost increase and mitigation rate to compare plausible downside and response scenarios.