1. Enter rated electrical input
Use the electrolyzer system power rating in megawatts for the selected boundary.
2. Set operating hours
Enter the number of hours the plant is expected to be available during the year.
3. Estimate load factor
Use average electrical loading as a percentage of rated input during those hours.
4. Enter specific energy use
Use kilowatt-hours of electricity per kilogram of hydrogen for the same system boundary.
5. Review production
Use annual kilograms and metric tons for offtake and storage planning, and check the average hourly rate for balance-of-plant sizing.