1. Define the recovery unit
Choose the unit used for the workload, such as pieces, bins, or batches, and keep it consistent with any observed cycle-time data.
2. Enter net available time
Use the recovery minutes actually available during the planning window after any exclusions you deliberately apply.
3. Enter recovery demand
Enter the number of defined scrap units that must be processed during the same window.
4. Read the takt requirement
The main result shows the maximum average minutes available per unit to clear the demand.
5. Compare with observed cycle time
A cycle time longer than takt indicates the current average processing pace is slower than the required workload pace under the entered assumptions.