1. Define a common period
Use metrics from the same class, term, or reporting window.
2. Enter four measures
Add achievement, growth, completion, and participation as percentages.
3. Set evaluation weights
Allocate importance to each measure according to the intended review framework.
4. Check the total
Weights must add to 100% before a composite is produced.
5. Interpret with context
Use the highest, lowest, and spread results alongside the composite.