1. Enter the paved area
Use the net surface area receiving the asphalt layer in square feet.
2. Enter compacted thickness
Use the finished in-place thickness in inches, not a loose lift depth unless your quantity basis specifically requires it.
3. Set mix density
Replace the default with the compacted density specified for the mixture or supplied by the producer when available.
4. Add an ordering allowance
Enter a percentage for planned overage such as minor yield variation or handling loss. Use 0% to see the base quantity only.
5. Review volume and tons
Check both the calculated compacted volume and tonnage before placing the quantity into a takeoff or order.