1. Enter finished attic area
Use the area that will become finished living or usable space in this budget scenario.
2. Set the interior finish rate
Enter a per-square-foot allowance for insulation/drywall finishes, flooring, trim, paint, and other area-driven work you intend to include.
3. Add structural and stair costs
Enter a separate allowance for reinforcement, stair construction, roof modifications, dormers, or similar work that does not scale neatly by floor area.
4. Add building systems and soft costs
Enter electrical/HVAC and permits/design as separate allowances to keep those scopes visible.
5. Apply contingency and review
Use contingency for unresolved scope and existing-condition uncertainty, then compare the total with your funding limit and later contractor bids.