1. Total the footing length
Add the continuous footing runs included in the takeoff and enter the combined length in feet.
2. Enter footing width
Use the designed footing width in inches.
3. Enter footing depth
Use the designed concrete depth in inches.
4. Set the waste allowance
Add a percentage if you want the planning quantity to exceed the theoretical volume.
5. Review base and adjusted volume
Use the base volume for geometric verification and the adjusted volume for material planning.