1. Enter planned driving time
Use the driving time for the route scenario you want to test.
2. Describe the stop workload
Enter the number of service stops and average minutes spent serving each stop.
3. Add depot time
Include loading, dispatch, check-in, or terminal time that belongs inside your route-duration definition.
4. Set a planning buffer
Add time for expected variability that is not already embedded in the other inputs.
5. Check total duration
Compare the total with your operational schedule and then apply any separate compliance constraints.