1. Enter conversion area
Use the floor area that will be part of the finished conversion.
2. Add material and labor allowances
Enter current estimates for finish materials, framing or repair materials, and construction labor.
3. Include approvals and design
Add permit fees and professional design or documentation costs relevant to the project.
4. Budget building-system work
Include heating and cooling, electrical, plumbing, or other system upgrades in the dedicated field.
5. Set contingency and review
Apply a reserve for uncertainty, then use the total and cost per square foot to compare scope options on a consistent basis.