1. Enter the net requirement
Use the measured material quantity needed for the finished garage conversion before adding waste.
2. Choose a waste allowance
Enter the percentage reserved for cutting, breakage, defects, and installation loss.
3. Add contingency if needed
Use the contingency field for uncertainty beyond normal waste, such as hidden conditions or spare material for future repairs.
4. Enter package size when useful
If the material is sold only in fixed package quantities, enter units per package. Leave it at 0 to skip package rounding.
5. Review purchase quantity
The result includes both allowances and, when package size is provided, rounds up to full packages.