1. Enter finished square footage
Use only the basement area included in this finish scope.
2. Set a material rate
Enter your current expected material cost per finished square foot based on the planned finish level.
3. Set a labor rate
Use an estimated or quoted labor cost per finished square foot. Keep owner-supplied labor out of this field if it will not be paid.
4. Add fixed project costs
Include permits, design, engineering, dumpsters, mobilization, or other costs that do not scale directly with area.
5. Choose a contingency and review
Apply a contingency to the subtotal and compare the resulting total with available funds and contractor proposals.