1. Enter the scheduled inspection window
Use the total minutes available in the period tied to the inspection demand.
2. Subtract planned non-inspection time
Remove breaks, meetings, calibration, or other planned time that will not be used to complete inspections.
3. Enter inspection demand
Use the number of inspection units that must be completed during the same period.
4. Read the required takt
The result shows average minutes available for each required inspection unit.
5. Compare takt with observed cycle time
A cycle time below takt indicates nominal speed capacity before considering variability, rework, and unplanned interruptions.